Overall Approved Definition-of-Done Status: Kick-Off
Next Major Definition-of-Done Milestone: Stable
Presentations
Specification
- Latest pdf from AsciiDoc: riscv-crypto-spec-vector.pdf
OpCode Encoding/OpCode consistency review
Architecture Tests
ABI Extensions
GCC and Assembler
- (Intrinsics)
(links to GitHub, etc., as relevant to each of the topics here)
(links to PLTC and IIT Madras status pages, TBD)